Loading...
031819 State Financial Assurance Program Landfill Appendix B CalculationsAppendix B - Financial Assurance Calculations Facility: Sheridan #2 I SHWD 4: 10.526 1 Date: 9/24/18 Conduct Annual Inspections (30 years) Closure Cost Calculations $45,000 1 $45,000 ACTIVITY UNIT COST/UNIT # of UNITS COSTS LINE Reclaim Disturbed Areas Acre $100,000 38.00 $3,800,000 1 Demolish Buildings Fe $11 5,828 $64,108 2 Install Groundwater Wells well $10,000 0 so 3 Install Methane Wells Well $4,000 0 so 4 Manage Stored Wastes yds, $50 3,000 $150,000 5 Install Perimeter Fence Linear Foot $2 0 $0 6 Conduct Final Site Survey Acre $1,300 38.00 $49,400 7 Construct Surface Water Structures Linear Foot $10 0 $0 8 SUB -TOTAL Closure Costs Remaining Amount Required for Post -Closure $4,063,508.00 9 15% Contingency Amount FA TOTAL - Post -Closure Costs (Line 25 x 3%) $609,526.20 10 TOTAL Closure Costs $4,673,034.20 11 Funds Dedicated/Earmarked for Closure (Subtract) S t,347,399.34 12 Remaining Amount Required for Closure $3,325,634.86 13 FA SUB -TOTAL - Closure Costs (Line 13 x 3%) $99,769.05 14 Annual Closure Cost FA Payment Calculation Post -Closure Cost Calculations ACTIVITY UNIT COST/UNIT # of UNITS COST $ LINE Conduct Annual Inspections (30 years) Facility $45,000 1 $45,000 15 Conduct Type I Groundwater Monitoring (30 years) Well $74,000 17 $1,258,000 16 Conduct Methane Monitoring (30 years) Well $15,000 15 $225,000 17 Maintain Perimeter Fence (30 years) Linear Foot S22 10,189 $224,158 18 Remove Perimeter Fence Linear Foot S4 10,189 $40,756 19 Maintain Surface Water Structures (30 years) Linear Foot $2 10,045 $20,090 20 SUB -TOTAL Post -Closure Costs `Note: FA payments will increase 5%/ ear until 100% of calculated annual payment is reached 20 years). $1,813,004.00 21 15% Contingency Amount $271,950.60 22 TOTAL Post -Closure Costs $2,084,954.60 23 Fonds Dedicated/Eamtarked for Past -Closure (Subtract) $360,000.00 24 Remaining Amount Required for Post -Closure $1,724,954.60 25 FA TOTAL - Post -Closure Costs (Line 25 x 3%) $51,748.64 26 mij Annual Closure Cost FA Payment Calculation LINE I certify, under penalty of perjury, that the FA SUB -TOTAL - Closure Costs (Line 14) $99,769.05 27 information presented is correct to the best of Total of Previous FA Closure Contributions (Subtract) $12,076.07 28 my knowledge and understand that this FA TOTAL -Closure Costs $87,692.98 29 certificati0^SllbjeCtt dit. Remaining Lifespan of Facility in ears 7 30 Stgna Nl%� Annual FA Closure Payment $12,527.57 31 Date Annual Post -Closure Cost FCalculation LIxE Title eS Eny The above attestation shall be signed by the FA SUB -TOTAL -Post -Closure Costs (Line 26) $51,748.64 32 Total of Previous Post -Closure FA Contributions (Subtract) $26,053.23 33 FA TOTAL - Post -Closure Costs $25,695.41 34 head of the governmental entity or ranking Remaining Lifespan of Facility in ears7 35 elected official. Annual FA Post -Closure Pa menu $3,670.77 36 Total Annual FA Payment - X809.92 37 Closure & Post -Closure x 5%)* `Note: FA payments will increase 5%/ ear until 100% of calculated annual payment is reached 20 years).