Executed Amendment No 03 Bid Package 3 and GMP Architecture Building SystemsDICK ANDERSON .: " TRUCriON April 26, 2018 Paul Young Sheridan Economic & Education Development Authority 55 Grinnell Plaza Sheridan, WY 82801 Re: Weatherby Headquarters & Manufacturing Facility Contract Amendment No. 03 — GMP Proposal Contract Amendment No. 01 to AIA Document A133 — 2009 Standard Form of Agreement between Owner and Construction Manager as Constructor between the Sheridan Economic & Education Development Authority and Dick Anderson Construction, Inc. Sheridan Economic & Education Development Authority (Owner) and DICK ANDERSON CONSTRUCTION, INC. (CM), for the WEATHERBY HEADQUARTERS & MANUFACTURING FACILITY (the Project), the Owner and CM establish the following terms to establish the Guaranteed Maximum Price (GMP) Proposal for the entire project as set forth below. GUARANTEED MAXIMUM PRICE Bid Package 01 — PEMB Supply and Erection.......................................................................... $2,137,699.00 Bid Package 02 — Earthwork & Concrete................................................................................ $2,621,011.00 Bid Package 03 — Architecture & Building Systems.............................................................. $7,230.760.00 Guaranteed Maximum Price........................................................................................... $11,989,470.00 The CM's Guaranteed Maximum Price for Work (inclusive of Bid Phase 1, 2 & 3) is ELEVEN MILLION NINE HUNDRED EIGHTY NINE THOUAND FOUR HUNDRED SEVENTY DOLLARS AND ZERO CENTS. This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Proposal and marked Exhibits A through D, as follows: Exhibit A Drawings, Specifications and Addendums on which the Guaranteed Maximum Price is based Exhibit B Alternates Exhibit C Allowances Exhibit D Assumptions and clarifications made in preparing the Guaranteed Maximum Price CONTRACT TIME Owner and CM agree that the date of Substantial Completion for the entire project shall be thirteen (13) months from the date of commencement. DICK ANDERSON CONSTRUCTION IWLII 311 r_1 DRAWINGS & SPECIFICATIONS ON WHICH THE GUARANTEED MAXIMUM PRICE IS BASED Project Manual — Bid Pack 3 Pages Weatherby Headquarters & Manufacturing Facility Bid Pack 3 — Architecture & Building Systems Dated March 30, 2018: Division 01- General Requirements: Invitationto Bid........................................................................................................... 1-3 Instructions to Bidders.................................................................................................. 1-7 Bid Package Descriptions.............................................................................................. 1-45 Weatherby Preliminary Project Schedule.......................................................................... 1-4 Bid Form for Bid Package 1 B — Final Cleaning.................................................................... 1-3 Bid Form for Bid Package 5B — Steel Fabrication & Erection .................................................. 1-2 Bid Form for Bid Package 6A — Rough Carpentry.................................................................1-3 Bid Form for Bid Package 6B — Finish Carpentry............................................................... 1-2 Bid Form for Bid Package 7A — Building Insulation............................................................. 1-2 Bid Form for Bid Package 7B — Metal Roofing.................................................................. 1-2 Bid Form for Bid Package 7C — Metal Wall Panels............................................................ 1-2 Bid Form for Bid Package 7D — Dam pproofing-Waterproofing ............................................. 1-2 Bid Form for Bid Package 8A— Doors Frames Hardware ................................................... 1-2 Bid Form for Bid Package 8B — Coiling Doors..................................._.............................. 1-2 Bid Form for Bid Package 8C — Translucent Panels.......................................................... 1-2 Bid Form for Bid Package 8D — Entrances, Storefronts & Glazing ........................................ 1-2 Bid Form for Bid Package 8E — Wood Windows............................................................... 1-2 Bid Form for Bid Package 9A— Metal Studs & Drywall....................................................... 1-2 Bid Form for Bid Package 9B —Acoustical Ceilings........................................................... 1-2 Bid Form for Bid Package 9C — Flooring & Tile................................................................. 1-2 Bid Form for Bid Package 9D — Painting & Staining........................................................... 1-2 Bid Form for Bid Package 10A— Specialties................................................................... 1-2 Bid Form for Bid Package 11A— Dock Equipment............................................................ 1-2 Bid Form for Bid Package 12A — Window Treatments....................................................... 1-2 Bid Form for Bid Package 14A — Elevator...................................................................... 1-2 Bid Form for Bid Package 21A — Fire Sprinkler............................................................... 1-2 Bid Form for Bid Package 23A — Mechanical Systems ...................................................... 1-2 N DICK ANDERSON CONSTRUCTION Bid Form for Bid Package 26A — Electrical Systems.......................................................... 1-2 Bid Form for Bid Package 32D — Fences & Gates.............................................................. 1-2 Bid Form for Bid Package 32E — Landscape & Irrigation..................................................... 1-2 Contractor Qualification Statement.................................................................................. 1-5 Dick Anderson Construction, Inc. — Standard Subcontract................................................... 1-12 2017 Certified Rates..................................................................................................... 1-1 AIA At 33-2009 Owner -Construction Manager Agreement..................................................... 1-19 AIA A201-2007 General Conditions...................................................................................1-39 Product Substitution Form............................................................................................. 1-1 Geotechnical Investigation Report-9/24/2014....................................................................1-31 Geotechnical Investigation Report (Update) - 11/29/2017..................................................... 1-22 010500 — Field Engineering.............................................................................................1-2 011000 — Summary .......................................................................................................1-4 012300 — Alternates...................................................................................................... 1-2 012500 —Substitution Procedures....................................................................................1-3 012600 — Contract Modification Procedures....................................................................... 1-2 012900 — Payment Procedures....................................................................................... 1-4 013100 — Project Management and Coordination..........................................._..................... 1-8 013200—Construction Progress Documentation................................................................. 1-5 013300 — Submittal Procedures....................................................................................... 1-11 014000 — Quality Requirements ............... ........................................................................ 1-8 014200 — References.................................................................................................... 1-8 015000 — Temporary Facilities and Controls...................................................................... 1-7 016000 — Product Requirements...................................................................................... 1-5 017300 — Execution.......................................................................................................1-7 017419 — Construction Waste Management and Disposal ..................................................... 1-4 017700 — Closeout Procedures........................................................................................1-5 017823 — Operation and Maintenance Data........................................................................1-7 017839 — Project Record Documents................................................................................ 1-4 017900 —Demonstration and Training...............................................................................1-5 DIVISION 2 — EXISTING CONDITIONS (Not Used) DIVISION 3 — CONCRETE 033000 — Cast -In -Place Concrete..................................................................................... 1-13 3 DICK ANDERSON CONSTRUCTION DIVISION 4 - MASONRY (Not Used) DIVISION 5 - METALS 051200 - Structural Steel................................................................................................. 1-9 053100 -Steel Decking ............ ....................................................................................... 1-5 054000 -Cold -Formed Metal Framing.............................................................................. 1-4 055000 - Metal Fabrications........................................................................................... 1-6 055113 - Metal Pan Stairs..............................................................................................1-9 1-5 055119 - Metal Grating Stairs......................................................................................... 1-9 DIVISION 6- WOOD, PLASTICS AND COMPOSITES 061000 - Rough Carpentry............................................................................... 1-6 061053 - Wood Decking................................................................................... 1-2 061733 -Wood I-Joists.................................................................................... 1-3 061800 - Glued -Laminated Wood Construction..................................................... 1-4 064023 - Interior Architectural Woodwork............................................................ 1-6 064116 - Plastic Laminate Faced Architectural Cabinets ......................................... 1-6 DIVISION 7 - THERMAL AND MOISTURE PROTECTION 071100 - Dampproofing.................................................................................. 1-3 071326 - Self -Adhering Sheet Waterproofing...................................................... 1-4 072100 -Thermal Insulation............................................................................ 1-3 072715 - Nonbituminous Self -Adhering Sheet Air Barriers ...................................... 1-4 074213.13 - Formed Metal Panels..................................................................... 1-5 076200 - Sheet Metal Flashing and Trim............................................................. 1-8 077200 - Roof Accessories............................................................................... 1-4 078413 - Penetration Firestopping - Penetration Firestopping UL Assemblies ............. 1-5 078443 - Joint Firestopping - Joint Firestopping UL Assemblies ............................... 1-4 079200 - Joint Sealants.................................................................................... 1-7 DIVISION 8 - OPENINGS 0811113 - Knockdown Hollow Metal Frames..........................................................1-4 0811114- Hollow Metal Doors and Frames............................................................1-4 081416 - Flush Wood Doors............................................................................... 1-8 4 DICK ANDERSON CONSTRUCTION 082472 — Sound control Hollow Metal Door Assemblies ........................................... 1-10 083613 — Sectional Doors................................................................................. 1-7 084113 — Aluminum -Framed Entrances & Storefronts ............................................. 1-7 084500 — Translucent Wall & Roof Assemblies...................................................... 1-6 085200 — Wood Windows. . .............................................................................. 1-4 087100 — Door Hardware................................................................................. 1-32 088000 — Glazing........................................................................................... 1-7 DIVISION 9 — FINISHES 092216 — Non -Structural Metal Framing.............................................................. 1-6 092900 — Gypsum Board................................................................................. 1-5 093013 — Ceramic Tiling.................................................................................. 1-5 095113 — Acoustical Panel Ceilings.................................................................... 1-3 096513 — Resilient Base and Accessories............................................................ 1-5 096519 — Resilient Tile Flooring......................................................................... 1-4 096813 —Tile Carpeting.................................................................................... 1-8 098000—Acoustical Wall & Ceiling Treatments...................................................... 1-5 099113 — Exterior Painting ......... ............................................................ .... ....... ..1-4 099123 — Interior Painting.....................................................................0............. 1-6 099300 — Staining & Transparent Finishing....................................................... P..0. 1-5 911969W i[i�9a*]/_1 WI 4` 101416 — Plaques............................................................................................ 1-6 101419 — Dimensional Letter Signage.................................................................. 1-4 101423 — Room Identification Signage.................................................................. 1-4 102113.13 — Plastic Toilet Compartments.............................................................. 1-3 102600 — Wall & Door Protection..........................................................................1-3 102800 — Toilet, Bath, and Laundry Accessories..................................................... 1-4 104413 — Fire Protection Cabinets........................................................................1-3 104416 — Fire Extinguishers............................................................................... 1-3 105113 — Metal Lockers..................................................................................... 1-5 107529 — Plaza -Mounted Flagpoles..................................................................... 1-3 DIVISION 11 — EQUIPMENT 5 DICK ANDERSON CONSTRUCTION 111313 — Loading Dock Bumpers........................................................................ 1-2 111316— Loading Dock Seals & Shelters.............................................................. 1-3 111319 — Stationary Loading Dock Equipment........................................................ 1-7 DIVISION 12 — FURNISHINGS (Not Used) DIVISION 13 — SPECIAL CONSTRUCTION (Not Used) DIVISION 14—CONVEYING SYSTEMS 142400 — Hydraulic Elevators........................................................................... 1-7 DIVISION 20 — FACILITY SERVICES 200500 — Common Plumbing & HVAC............................................................... 1-11 200513 — Common Motor Requirements............................................................ 1-4 200518 — Escutcheons & Plates........................................................................ 1-2 200519 — Metal & Gauges................................................................................ 1-5 200523 — General Duty Valves......................................................................... 1-4 200529 — Hangers & Supports.......................................................................... 1-6 200553 — Piping & Equipment Identification......................................................... 1-5 200590 — Testing Adjusting & Balancing............................................................. 1-13 DIVISION 21 — FIRE SUPPRESSION 211313 — Fire Sprinkler and Fire Pump............................................................. 1-15 DIVISION 22 — PLUMBING 220719 — Plumbing Piping Insulation................................................................. 1-5 221010 — Plumbing Piping............................................................................... 1-14 221020 — Plumbing Piping Specialties............................................................... 1-7 221429 — Sump Pumps................................................................................... 1-5 221513 — General Service Compressed Air Piping ................................................ 1-3 223000 — Plumbing Equipment.......................................................................... 1-3 223410 — Gas Water Heaters............................................................................ 1-6 224200 — Plumbing Fixture............................................................................... 1-9 DIVISION 23 — HEATING, VENTILATING AND AIR CONDITIONING 230713 — Duct Insulation................................................................................. 1-3 G1 DICK ANDERSON CONSTRUCTION 230910 — Variable Frequency Controllers............................................................. 1-5 232310 — Refrigerant Piping............................................................................... 1-6 233110 — HVAC Metal Ductwork.......................................................................... 1-9 233300 — HVAC Duct Accessories....................................................................... 1-5 233420 — Power Ventilators................................................................................1-3 1-9 233513 — Dust Collection Systems....................................................................... 1-14 233600 — Air Terminal Units................................................................................ 1-4 233710 — Grilles Registers & Diffusers.................................................................. 1-3 233720 — Louvers & Hoods................................................................................. 1-3 233860 — Fire Suppression Range Hoods...............................................................1-4 234100 — Particulate Air Filtration......................................................................... 1-5 235100 — Gas Vents & Chimneys....................................................................... 1-5 235416 — Gas Fired Furnaces........................................................................... 1-7 235533 — Gas Fired Unit Heaters........................................................................ 1-4 236210 — Packaged Condensing Units................................................................. 1-6 237300 — Modular Air Handling Units................................................................... 1-10 237310 — Packaged System Controls.....................................................................1-10 237330 — Vertical Air Rotation Units.......................................................................1-9 237340 — Stand Alone System Controls..................................................................1-4 237423 — Outdoor Direct fired Air Makeup Units.......................................................1-6 237433 — Indoor Indirect Fired Air Makeup Units......................................................1-6 238110 — Terminal Heat Transfer Units..................................................................1-2 238130 — Ductless Split Systems........................................................................ .1-3 DIVISION 26 — ELECTRICAL 260010 — General Electrical Requirements........................................................... 1-11 260519 — Low Voltage Electrical Power Conductors & Cables .................................. 1-9 260526 — Grounding & Bonding for Elect Systems ................................................. 1-6 260529 — Hangers & Supports for Elect Systems ................................................... 1-4 260533 — Conduit for Elec Systems..................................................................... 1-9 260534 — Boxes for Elec Systems........................................................................ 1-6 260553 — Identification for Elec Systems................................................................1-6 260583—Wiring connections..............................................................................1-4 260916 — Electric controls & Relays...................................................................... 1-2 7 DICK ANDERSON 260919 — Enclosed Contactors........................................................................... 1-2 262100 — Low voltage Electrical Service Entrance ................................................... 1-3 262200 — Low voltage Dry Type Transformers ................................... ......... ............. 1-5 262413 — Switchboards...................................................................................... 1-8 262416 — Panelboards.......................................................................................1-8 262513 — Low Voltage Busways.......................................................................... 1-6 262726 —Wiring Devices.................................................................................... 1-8 262813 —Fuses ................................................................................................1-2 262816 — Enclosed Switches................................................................................1-4 262913 — Enclosed Controllers.............................................................................1-6 264300 — Surge Protection Device........................................................................1-5 265100 — Interior Lighting....................................................................................1-8 265600 — Exterior Lighting....................................................................................1-6 DIVISION 27 — COMMUNICATIONS 271005 — Structured Cabling & Equip for Voice & Data .......................... ................. 1-11 275116 — Public Address Systems.....................................................................1-7 DIVISION 28 — ELECTRONIC SAFETY AND SECURITY 281000 — Electronic Access Control .................... ...................................... ......... 1-39 283105 — Fire Alarm System..............................................................................1-8 DIVISION 31 — EARTHWORK (Not Used) DIVISION 32 — EXTERIOR IMPROVEMENTS 328400 — Irrigation......................................................................................... 1-8 329113 — Soil Preparation............................................................................... 1-5 329200 — Turf & Grasses................................................................................ 1-4 329300 — Plants............................................................................................. 1-7 9 DICK ANDERSON CONSTRUCTION DRAWINGS LIST — Bid Pack 3 — Architecture & Building Systems NUMBER TITLE DATE G000 Cover Sheet 03/30/18 G002 Code Plan 03/30/18 C000 Legend & Notes 03/30/18 C100 Original Site Plan 03/30/18 C101 Site Plan 03/30/18 C102 Site Plan Alternates 03/30/18 C103 Grading Plan 03/30/18 C104 Grading Sections 03/30/18 C105 Utility Plan 03/30/18 C106 Sign Plan 03/30/18 C107 Details 03/30/18 C108 Details 03/30/18 C200 Water Main Plan & Profile 03/30/18 C201 Details 03/30/18 C300 Sanitary Sewer Plan & Profile 03/30/18 C301 Sanitary Sewer Details 03/30/18 C400 Storm Sewer Plan & Profile 03/30/18 C401 Storm Sewer Details 03/30/18 C500 Shooting Tunnels — Plan and Profile 03/30/18 C600 Site Logistics & Erosion Control Plan 03/30/18 C601 Details 03/30/18 L101 Irrigation Plan 03/30/18 L102 Landscape Plan 03/30/18 L103 Landscaping Details 03/30/18 S101 General Notes 03/30/18 S102 General Notes 03/30/18 S103 Typical Foundation & Concrete Details 03/30/18 S104 Typical Wood & Steel Details 03/30/18 S105 Load Keys 03/30/18 S106 MBS Reaction Key Plan 03/30/18 5200 Basement Plan 03/30/18 S200A Alternate #4 Plans 02/21/18 5201 Overall Main Level Plan 03/30/18 DICK ANDERSON CONSTRUCTION S201 Partial Main Level Plan 03/30/18 S201 B Partial Main Level Plan 03/30/18 S202 Upper Level Framing Plan 03/30/18 S300 Entry Roof Elevations & Details 03/30/18 S400 Foundation Details 03/30/18 S401 Foundation Details 03/30/18 S402 Elevator/Stair Plans & Details 03/30/18 S500 Schedules 03/30/18 A201 Floor Plan - Basement 03/30/18 A202 Floor Plans - Office 03/30/18 A203 Floor Plan 1 n Floor — Manufacturing 03/30/18 A204 Upper Manufacturing Clerestory Floor Plan 03/30/18 A210 Plan Details 03/30/18 A301 Reflected Ceiling Plans 03/30/18 A302 Reflected Ceiling Plans 03/30/18 A401 Roof Plan 03/30/18 A501 Exterior Elevations Overall 03/30/18 A502 Building Elevations 03/30/18 A503 Building Elevations 03/30/18 A504 Building Elevations 03/30/18 A520 PEMB Elevations 03/30/18 A521 PEMB Elevations 03/30/18 A522 PEMB Elevations 03/30/18 A601 Building Sections 03/30/18 A602 Building Sections 03/30/18 A603 Building Sections 03/30/18 A610 Wall Sections 03/30/18 A611 Wall Sections 03/30/18 A620 Vertical Details 03/30/18 A701 Stair Plans, Sections & Details 03/30/18 A702 Stair Plans & Sections 03/30/18 A703 Stair Plan, Sections, Elevations & Details 03/30/18 A704 Stair Plan, Sections & Details 03/30/18 A705 Elevator Plan, Section Details 03/30/18 A801 Door/Window Plan & Schedule 03/30/18 A802 Door/WindowTypes & Details 03/30/18 10 DICK ANDERSON CONSTRUCTION A810 DoorNVindow Details 03/30/18 A901 Finish Plan 03/30/18 A902 Finish Plan 03/30/18 A910 Enlarged Restroom Plans/Elevations 03/30/18 A911 Enlarged Restroom Plans/Elevations 03/30/18 A912 Enlarged Restroom Plans/Elevations 03/30/18 A913 Enlarged Restroom Plans/Elevations & Casework 03/30/18 A920 Enlarged Plans/Interior Elevations 03/30/18 A940 Manufacturing Equipment Floor Plan 03/30/18 A941 Manufacturing Equipment & Schedules 03/30/18 FP100 Fire Sprinkler Cover 03/30/18 FP101 Fire Sprinkler Overall Plan 03/30/18 FP102 Fire Pump Plans 03/30/18 FP200 Fire Sprinkler Floor Plans — Basement 03/30/18 FP201 Fire Sprinkler Floor Plans — Office 03/30/18 FP202 Fire Sprinkler Floor Plans — 1st Floor Manufacturing 03/30/18 FP203 Fire Sprinkler Floor Plans — Upper MFGR/Clerestory 03/30/18 M001 Mechanical Cover Sheet & Notes 03/30/18 M101 Plumbing & HVAC Roof Plans 03/30/18 M102 Plumbing & HVAC Roof Plans 03/30/18 M103 Plumbing & HVAC Roof Plans 03/30/18 M201 Drain Waste & Vent Plans 03/30/18 M202 Drain Waste & Vent Plans 03/30/18 M203 Drain Waste & Vent Plans 03/30/18 M204 Drain Waste & Vent Plans 03/30/18 M301 Domestic Piping Plans 03/30/18 M302 Domestic Piping Plans 03/30/18 M303 Domestic Piping Plans 03/30/18 M304 Domestic Piping Plans 03/30/18 M601 HVAC Sheet Metal Plans 03/30/18 M602 HVAC Sheet Metal Plans 03/30/18 M603 HVAC Sheet Metal Plans 03/30/18 M604 HVAC Sheet Metal Plans 03/30/18 M701 HVAC Equip/Device Plans 03/30/18 M702 HVAC Equip/Device Plans 03/30/18 M703 HVAC Equip/Device Plans 03/30/18 11 DICK ANDERSON CONSTRUCTION M704 HVAC Equip/Device Plans 03/30/18 M801 Large Scale Plans and Sections 03/30/18 M802 Mechanical Details & Schematics 03/30/18 E-001 Electrical Site Plan 03/30/18 E101 Lighting Plan 03/30/18 E102 Lighting Plan 03/30/18 E103 Lighting Plan 03/30/18 E104 Lighting Plan 03/30/18 E201 Power Plan 03/30/18 E202 Power Plan 03/30/18 E203 Power Plan 03/30/18 E204 Power Plan 03/30/18 E301 Special Systems Plan 03/30/18 E302 Special Systems Plan 03/30/18 E303 Special Systems Plan 03/30/18 E304 Special Systems Plan 03/30/18 E401 Mechanical Devices Plan 03/30/18 E402 Mechanical Devices Plan 03/30/18 E403 Mechanical Devices Plan 03/30/18 E404 Mechanical Devices Plan 03/30/18 E500 Electrical Schedules 03/30/18 E501 Electrical Details 03/30/18 E502 Electrical Details 03/30/18 E600 Electrical Panel Schedules 03/30/18 E601 Electrical Panel Schedules 03/30/18 E602 Electrical Panel Schedules 03/30/18 12 DICK ANDERSON Addendum List — Bid Pack 3 — Architecture & Building Systems NUMBER TITLE DATE PAGES 01 Project Enterprise — Bid Phase 3 — Addendum No. 01 04/10/18 1-22 02 Project Enterprise — Bid Phase 3 — Addendum No. 02 04/18/18 1-36 03 Project Enterprise — Bid Phase 3 — Addendum No. 03 04/20/18 1-2 13 DICK ANDERSON EXHIBIT B BID PHASE 2 - ALTERNATE NO. 03 — ASPHALT PAVING AT EMPLOYEE PARKING: Accepted by Owner. Provide Asphalt Paving on the parking lot on south side of building. Bid Phase 2 - Alternate No. 03 — Asphalt Paving at Employee Parking ............................. Included in GMP BID PHASE 2 - ALTERNATE NO. 04 —2nd 100 -YARD SHOOTING RANGE: Not accepted Provide a 2nd 100 -Yard Shooting Range. Bid Phase 2 - Alternate No. 04 — Provide a 2nd 100 -Yard Shooting Range .......................... Not Accepted BID PHASE 2 - ALTERNATE NO. 05 —INSTALL FOUNDATION DRAIN AROUND BASEMENT: Accepted by Owner. Install foundation drain around Basement. Bid Phase 2 - Alternate No. 05 — Install Foundation Drain around Basement .................. Included in GMP BID PHASE 3 - ALTERNATE NO. 06—P-19/QE ROOMS IN MANUFACTURING: Accepted by Owner. Construct P-19/QE Rooms in Manufacturing. Bid Phase 3 - Alternate No. 06 — P-191QE Rooms in Manufacturing ............................... Included in GMP BID PHASE 2 - ALTERNATE NO. 07 —ADDITIONAL SIDEWALK: Accepted by Owner. Install Sidewalk at Yellowtail Dr. and connector sidewalk from Yellowtail Drive to Building. Bid Phase 2 - Alternate No. 07 —Additional Sidewalk .................................................... Included in GMP 14 DICK ANDERSON BID PHASE 3 - ALTERNATE NO. 08 —EXTRA CASEWORK: Accepted by Owner. Provide and Install additional casework outlined in Bid Phase 3 Construction Documents. Bid Phase 3 - Alternate No. 08 — Extra Casework....................................................... Included in GMP BID PHASE 3 - ALTERNATE NO. 09 —WIINDOS SHADES: Accepted by Owner. Provide and install window shades as outlined in Bid Phase 3 Construction Documents. Bid Phase 3 - Alternate No. 09 — Window Shades... .............. — ................... ............... Included in GMP 15 DICK ANDERSON EXHIBIT C ALLOWANCES (Included in Guaranteed Maximum Price) Not Applicable/No Allowances are incorporated in this GMP Proposal. 16 DICK ANDERSON CONSTRUCTION LW42W NAC ASSUMPTIONS AND CLARIFICATIONS • The GMP Proposal excludes providing a Final Property Survey as outlined in Specification Section 017300 — Execution, 3.4 — Field Engineering, Item E. — Final Property Survey. It is our understanding through discussions with Arete Design Group, that this work is not necessary or desired. • The GMP excludes Quality Control Testing, it is our understanding that Owner will pay for all Quality Control Testing outside of this contract. • The GMP provides for supply/installation of Fixed Frame, Direct Set wood window units manufactured by Pella. It is our understanding that these window units meet the intent of the project specifications. • The GMP provides for supply and installation of translucent panels manufactured by Kallwall. It is our understanding that Kallwall translucent panels meet the intent of the project specifications. • It is our understanding that the Phone System is to be provided and installed by Owner/Tenant and is excluded from the GMP. • It our understanding that the Video Cameras and associated equipment are to be provided by Owner/Tenant and are excluded from the GMP. • The GMP excludes supply of kitchen appliances. It is our understanding that kitchen appliances will be supplied by Owner. • Flat screen TV displays are excluded from the GMP. • The GMP includes a Construction Contingency in the amount of Three Hundred and Sixty Thousand Dollars ($360,000.00) for use by Construction Manager to carry out the work of this Project. Any monies unspent from this Construction Contingency will be returned to Owner. • The GMP includes and Owner Contingency of Eighty Eight Thousand Eight Hundred Seventy Dollars ($88,870.00) for use by Owner at its sole discretion. Any monies unspent from the Owner Contingency at project completion will be returned to Owner. • Due to volatility of the construction market and its effect on material shortages, schedule and price escalation, this Proposal is predicated on receiving written acceptance within ten (10) days of proposal submission. After which, GMP Proposal and Alternate pricing listed is subject to change. Accepted By: SHERIDAN EDUCATION & DEVELOPMENT AUTHORITY By: Paul Youn Its: President DICK ANDERSON CONSTRUCTION, INC. S� zp- � By: Brian BoltoR— Its: Vice President 17