Dick Anderson Contract Weatherby Building Bid Pack 1DICK ANDERSON CO NST R U CT I O N February 20, 2018 Paul Young Sheridan Economic & Education Development Authority 55 Grinnell Plaza Sheridan, WY 82801 Re: Weatherby Headquarters & Manufacturing Facility Contract Amendment No. 01 Contract Amendment No. 01 to AIA Document A133 — 2009 Standard Form of Agreement between Owner and Construction Manager as Constructor between the Sheridan Economic & Education Development Authority and Dick Anderson Construction, Inc. Sheridan Economic & Education Development Authority (Owner) and DICK ANDERSON CONSTRUCTION, INC. (CM), for the WEATHERBY HEADQUARTERS & MANUFACTURING FACILITY (the Project), the Owner and CM establish the following terms for commencement of the Construction Phase prior to completion of the Pre - Construction Phase in absence of the Guaranteed Maximum Price (GMP) Proposal for the entire project as set forth below. Owner authorizes Dick Anderson Construction, Inc. to commence the Construction Phase of the Project prior to completion of the Pre -Construction Phase. Owner and Dick Anderson Construction, Inc. agree to proceed with Construction Phase work in absence of a GMP for the entire project until such time the GMP can be established. Both parties agree that the GMP Proposal for the entire project shall be submitted for Owner approval following receipt of Bid Phase 3 subcontractor bid proposals, anticipated to be received on April 12, 2018. Furthermore Owner and Dick Anderson Construction, Inc. agree as follows: • Owner authorizes Dick Anderson Construction, Inc. to proceed with Bid Phase One work inclusive of Bid Package 13A — Pre -Engineered Metal Building Supply and Erection and all associated General Requirements; Permits, Fees, Bonds and Insurance on or about March 21, 2018. GUARANTEED MAXIMUM PRICE — BID PHASE 1 — PEMB SUPPLY AND ERECTION Bid Package 01A — General Requirements, Permits, Fees, Bonds & Insurance ....................... $ 305,830.00 Bid Package 13A — Pre -Engineered Metal Building Supply & Erection .................................... $1,975,000.00 Bid Package 13A — Alternate No. 01 — Reduce One Bay of Manufacturing ........................... ($ 104,650.00) Bid Package 13A — Omit Two (2) 60'x60' Clerestories....................................................... ($ 75,929.00) Bid Package 13A — Enlarge Center Clerestory to 60' x 90' Dimension .................................. $ 17,449.00 Bid Package 13A — Omit Three (3) Roof Gable Overbuilds — GL'D'.................................... ($ 6,544.00) Bid Package 13A — Utility Saver Insulation in lieu of Simple Saver Insulation ........................ ($ 11,084.00) Bid Package 13A — Provide B&C Steel 26 ga. PBR Wall & Soffit Panels in lieu of IC72 Panels. ($ 33,667.00) Bid Package 13A — PEMB Standard Mezzanine Design ..r ............................................... (8 10.92:5.00) Sub -Total $2,055,480.00 CMARFee(4.0%).........................•........................................................................ $ 82,219.00 Guaranteed Maximum Price — Bid Phase 1....................................................................... $2,137,699.00 The CM's Guaranteed Maximum Price for the Work is TWO MILLION ONE HUNDRED THIRTY SEVEN THOUSAND SIX HUNDRED NINETY NINE DOLLARS AND ZERO CENTS. This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Proposal and marked Exhibits A through D, as follows: DICK ANDERSON CONSTRUCTION Exhibit A Drawings, Specifications and Addendums on which the Guaranteed Maximum Price is based Exhibit B Alternates Exhibit C Allowances Exhibit D Assumptions and clarifications made in preparing the Guaranteed Maximum Price CONTRACT TIME Owner and CM agree that the date of Substantial Completion for the entire project shall be established following receipt of Bid Phase 3 subcontractor bid proposals. DICK ANDERSON EXHIBIT A DRAWINGS & SPECIFICATIONS ON WHICH THE GUARANTEED MAXIMUM PRICE IS BASED Proiect Manual — Bid Pack 1 Paaes Weatherby Headquarters & Manufacturing Facility Bid Pack 1 — Pre -Engineered Metal Building Supply & Erection dated February 1, 2018: Division 01- General Requirements: Invitationto Bid........................................................................................................... 1-3 Instructions to Bidders............................................................................... .............. 1-7 Bid Package Outline for Bid Package 13A........................................................... 1-4 .............. Bid Form for Bid Package 13A......................................................................................... 1-3 Contractor Qualification Statement................................................................................... 1-5 Dick Anderson Construction, Inc. — Standard Subcontract................................................... 1-12 2017 Certified Rates..................................................................................................... 1-1 Geotechnical Investigation Report — 9/24/2014....................................................................1-31 Geotechnical Investigation Report (Update) - 11/29/2017...................................................... 1-22 011000 — Summary.......................................................................................................1-4 012300 — Alternates............................................................................ .. 1-2 ........................ 012500 —Substitution Procedures.....................................................................................1-3 012600 — Contract Modification Procedures....................................................................... 1-2 012900 — Payment Procedures....................................................................................... 1-4 013100 — Project Management and Coordination................................................................ 1-8 013200 — Construction Progress Documentation................................................................. 1-5 013300 — Submittal Procedures.........................................,..........,.................................. 1-11 014000 — Quality Requirements ........................................ ............................................... 1-8 014200 — References..................................................................................................... 1-8 015000 — Temporary Facilities and Controls....................................................................... 1-7 016000 — Product Requirements...................................................................................... 1-5 017300 — Execution..................................................................... ............_..............1-9 017419 — Construction Waste Management and Disposal..................,. ................................. 1-8 017700 — Closeout Procedures........................................................................................ 1-5 017823 — Operation and Maintenance Data ....................... .......................................... ....... 1-7 017839 — Project Record Documents.............................................................. :...... .... ....... 1-4 3 DICK ANDERSON CONSTRUCTION DIVISION 2-12 — (Not Used) DIVISION 13 — SPECIAL CONSTRUCITON 133419 — Metal Building Systems......................................................................................1-15 133419.13 — Metal Building Systems Structural Criteria....................................................... 1-11 DIVISION 14-33 — (Not Used) DRAWINGS LIST — Bid Pack 1 - Pre -Engineered Metal Building NUMBER TITLE DATE G000 Cover Sheet 02/01/18 C600 Site Logistics Plan 02/01/18 A202 Floor Plans — Office 02/01/18 A203 Floor Plan — 1St Floor Manufacturing 02/01/18 A204 Upper Manufacturing Clerestory Floor Plan 02/01/18 A401 Roof Plan Office 02/01/18 A402 Manufacturing Roof Plan 02/01/18 A501 Exterior Elevations Overall 02/01/18 A502 Building Elevations 02/01/18 A503 Building Elevations 02/01/18 A504 Building Elevations 02/01/18 A510 Enlarged Elevations & Details 02/01/18 A520 PEMB Elevations 02/01/18 A521 PEMB Elevations 02/01/18 A522 PEMB Elevations 02/01/18 A613 PEMB Wall Section and Details 02/01/18 Addendum List - Bid Pack 1 - Pre -Engineered Metal Building NUMBER TITLE DATE PAGES 01 Project Enterprise — Bid Phase 1 — Addendum No. 01 02/12/18 8 4 DICK ANDERSON EXHIBIT B ALTERNATES BID PHASE 1 - ALTERNATE NO. 01 — REDUCTION OF ONE BAY MANUFACTURING: ACCEPTED BY OWNER Cost reduction to decrease length of manufacturing portion of building by 1 — 30' bay (or approximately 5,400 sf) as shown in the drawings. Bid Phase 1 - Alternate No. 01 — Reduction of One Bay Manufacturing ............................. Included in GMP DICK ANDERSON CONSTRUCTION EXHIBIT C ALLOWANCES (Included in Guaranteed Maximum Price) Not Applicable/No Allowances are incorporated in this GMP Proposal. DICK ANDERSON CONSTRUCTION EXHIBIT D ASSUMPTIONS AND CLARIFICATIONS The GMP Proposal assumes and relies upon the following modifications to the Bidding Documents as agreed between Owner, Design Team and CM: 1) This Proposal assumes Alternate No. 01 — Reduction of one bay of Manufacturing has been accepted by the Owner. 2) The GMP assumes that two (2) 60'x 60' clerestories will be omitted from the scope of the project. 3) The GMP provides for enlarging the center clerestory to a footprint of 60' x 90'. 4) This Proposal assumes that sno-bar retention systems will not be required on the enlarged, center clerestory roof. 5) This Proposal assumes that three (3) small gable roof overbuilds located along Grid -Line `D' on the north side of the manufacturing building roof will be eliminated from the scope of Bid Package 13A — Pre - Engineered Metal Building Supply and Erection. 6) We have provided for supply and installation of Utility Saver, primary wall and roof insulation systems manufactured by Thermal Designs, Inc. in lieu of the basis -of design Simple Saver system. 7) This Proposal provides for supply and installation of pre-engineered metal building manufacturer's (B&C Steel) standard 26 -gauge (colored) 'PBR' wall and soffit panels on entire building in lieu of Basis -of - Design Metal Sales 24 -gauge, IC72 wall and soffit panels. 8) The GMP provides for pre-engineered metal building manufacturer (B&C Steel) standard mezzanine design for Office mezzanine. B&C Steel's standard mezzanine design for specified 50 psf LL, 15 psf partition load, 60 psf DL (as designed by B&C's registered engineer) has been provided. Please note that special floor vibration requirements for the Office mezzanine outlined in Specification Section 133419.13, Section 1.6 — Structural Requirements, Item 4. Floor Vibration Requirements is specifically excluded from this Proposal. The GMP provides for supply and installation of pre-engineered metal building manufacturer's (B&C Steel) standard metal trims for finish out of exterior openings. Please note that supply and installation of a 6" tall x 2" deep break metal trim around all exterior openings is specifically excluded from this Proposal. The GMP excludes Quality Control Testing, it is our understanding that Owner will pay for all Quality Control Testing outside of this contract. The GMP excludes any and all costs associated with winter protection, temporary enclosures and/or temporary heating. It is assumed these costs will be accounted for in subsequent Contract Amendments. Accepted By: SHERIDAN EDUCATION & DEVELOPMENT AUTHORITY DICK ANDERSON CONSTRUCTION, INC. AA---fr V ` r By: Paul Young By: Brian Bolton Its: President Its: Vice President